Houston · Cypress · Katy · Memorial
Commercial · Average typical commercial install in 2–5 working days on site

Generator Installs

Sized to the metered load, sited on a proper pad, fuel planned for the longest outage on record. ATS wiring and live commissioning on every build.

About this service

Generator Installs for Houston Area Buildings

When the grid drops, your business should not. Solivance Electric installs commercial standby generators from 22 kW single-phase through 150 kW three-phase — medical suites, warehouses, multi-tenant offices, retail pads, and high-end residential across Greater Houston. Every install starts with a load calc against metered demand, not a sales-sheet guess. Generator siting accounts for exhaust clearance, noise to the nearest property line, refueling access, and the concrete pad spec the manufacturer actually called for. The Automatic Transfer Switch is wired, mechanically interlocked where required, and commissioned with a live grid-drop test. The first annual service date is on the calendar before we leave.

Sized to the metered load, sited on a proper pad, fuel planned for the longest outage on record. ATS wiring and live commissioning on every build.

What's included

  • Commercial standby installs from 22 kW through 150 kW
  • Automatic transfer switch wiring and commissioning
  • Load calc, fuel sizing, and annual maintenance intervals
  • Concrete pad, fuel line, and emissions permit handling
Google review
I definitely recommend Solivance Electric to anyone looking for a great, honest electrician. I cannot say enough good things about this company. After being without power for two days after Hurricane Beryl, we reached out wanting a generator interlock installed. Solivance Electric came out that very same day — they had worked through the night to get to everyone else needing the same. They made it clear they were prioritizing homes with children and pets. Aside from the interlock, they found other issues in the panel that could have caused a fire. These are my go-to guys from here on.
Yeny V.

How it works

01
Load calc against real demand

We read 12 months of metered demand, not a nameplate total, and size the gen-set to actual peak plus a motor-starting safety factor.

02
Site layout + fuel plan

Pad location, exhaust and intake clearances, fuel source (natural gas vs diesel vs LP), and refueling access designed before a hole is dug.

03
Pad, gen-set, ATS, gas

Concrete pad to manufacturer spec. Generator set, leveled and anchored. ATS wired and mechanically interlocked. Gas line sized and pressure-tested.

Pricing

A 22–35 kW commercial standby generator install typically runs $14,000–$28,000 turnkey (unit, ATS, pad, gas line, commissioning). 48–80 kW units run $28,000–$60,000. Larger 125–150 kW commercial gen-sets with paralleling or larger ATS builds push past $85,000. Fuel infrastructure, service-entrance upgrades, and enclosure selection (sound-attenuated, weather-protective, level 2) are the biggest variables.

Timeline

Most commercial standby installs are 2–5 working days on site once the gear is delivered: pad cure, gen-set set, fuel line run, ATS wired, commissioning, and final inspection. Equipment lead time adds 4–12 weeks depending on the manufacturer and size. Permits sit inside that window — not after it.

Code & permits

Commercial standby gen-set work in Greater Houston touches NEC Article 702 (optional standby systems) and 700 where the gen-set is backing life-safety or emergency loads. Fuel installations are reviewed against NFPA 37 (stationary combustion engines) and local fire-marshal notes. For natural-gas feeds, CenterPoint Energy gas-side capacity and metering is confirmed ahead of install.

NEC 700/702NFPA 37Harris County PermitsFire Marshal ReviewCenterPoint Gas

Frequently Asked Questions

How much does a commercial standby generator installation cost?+
A 22–35 kW commercial standby generator install typically runs $14,000–$28,000 turnkey (unit, ATS, pad, gas line, commissioning). 48–80 kW units run $28,000–$60,000. Larger 125–150 kW commercial gen-sets with paralleling or larger ATS builds push past $85,000. Fuel infrastructure, service-entrance upgrades, and enclosure selection (sound-attenuated, weather-protective, level 2) are the biggest variables.
How long does a standby generator install take?+
Most commercial standby installs are 2–5 working days on site once the gear is delivered: pad cure, gen-set set, fuel line run, ATS wired, commissioning, and final inspection. Equipment lead time adds 4–12 weeks depending on the manufacturer and size. Permits sit inside that window — not after it.
What size generator does my building need?+
The right answer comes from a real load calc, not a spec sheet. We pull 12 months of CenterPoint demand data (or meter the load with clamp-on recorders for 7 days) and size the gen-set to real peak plus a margin for motor starts. Undersizing causes nuisance trips on startup. Oversizing wastes capital and under-loads the engine.
Natural gas or diesel — which should I pick?+
Natural gas wins on refueling (the line is already there), maintenance intervals, and emissions. Diesel wins on runtime per gallon and survives if the gas utility drops with the grid. For most commercial buildings in Greater Houston we spec natural gas; for critical 72-hour loads or remote sites, diesel with a day-tank.
Do you install the automatic transfer switch?+
ATS wiring and commissioning are in every install. Service-entrance-rated ATS where required, mechanical interlock for code compliance, programmed transition timing, and a documented live grid-drop test at the end.
Do you do annual maintenance on the gen-sets you install?+
Yes. Oil, filters, coolant, battery, ATS contact inspection, load-bank test every second year, and a written report. A unit that sits 51 weeks and runs once is not a reliable unit — the service contract is what makes it one.
Can a standby gen-set run my whole building or just essential loads?+
Either, and the answer is a cost conversation. Whole-building standby means sizing the gen-set and ATS for the full service. Essential-loads only means a sub-panel of your critical circuits on transfer — cheaper unit, smaller pad, and the non-critical loads stay off during outages.
Do you handle the fire-marshal review and fuel permitting?+
Yes. We file the permit, coordinate with the local fire marshal on clearance and gas-line review, and run the inspection. The package you sign covers all of it.

Ready to get started?

Free site walk. Fixed-fee quote in 24 hours. Permits pulled and inspections passed on the first walk.