Pole and shoebox installs, HID-to-LED retrofits, and trench-to-fixture ground-up builds. Photocells and timers standard. Light where it is supposed to go.

About this service

Parking Lot Lighting for Houston Area Buildings

Dark parking lots are a liability — slip-and-fall claims, tenant complaints, insurance premium hikes, and after-hours incidents that get blamed on the lighting plan. Solivance Electric designs and installs commercial parking-lot lighting across Houston, Cypress, Katy, and Memorial. Every lot starts with an actual photometric layout (IES files, not a lumen guess) showing footcandles at the pole base, at the middle of the drive lane, and at the darkest corner. We retrofit the HID and metal-halide fixtures you already have, swap tired poles, run underground conduit for new-build lots, and ship every job with photocells and timers so the lot turns itself on at civil twilight without a truck roll.

Pole and shoebox installs, HID-to-LED retrofits, and trench-to-fixture ground-up builds. Photocells and timers standard. Light where it is supposed to go.

What's included

  • LED pole, shoebox, and wall-pack fixtures
  • Photocell and timer-based controls
  • HID-to-LED retrofit on existing poles
  • Trenching, conduit, and underground feeder runs
Google review
I recently hired Solivance Electric to replace the can lights in my home with LED. I was particularly impressed with the quality of the LED can lights they provided. The lighting in my home has been significantly improved — both in brightness and energy efficiency. I have noticed a decrease in my electricity bills since the installation. I RECOMMEND THEM 100%.
Sandra G.

How it works

01
Photometric design

IES files for every fixture. Footcandle plot against the actual lot geometry. Pole heights and wattages selected for the real coverage — not a brochure guess.

02
Fixture + pole selection

LED wattage, color temperature, optical distribution, shoebox vs aeroscape, dark-sky cutoff where required by the AHJ. Photocell and timer controls as standard.

03
Install after hours

Bucket truck on a cone plan so tenant traffic never stops. HID fixtures pulled, drivers set, aimed to the design. Trenching and conduit runs on separate days for new-build.

Pricing

An HID-to-LED retrofit on existing poles typically runs $350–$900 per fixture installed (bucket truck, drivers, labor, disposal). Full ground-up builds with new poles, concrete bases, and underground conduit run $3,500–$7,500 per pole assembly. Wall-pack and shoebox retrofits start at $250 per fixture. Trenching charges are per foot and site-dependent — rocky Cypress clay prices differently than loose Memorial fill.

Timeline

Most tenant-occupied lots are re-lit in 3–7 working days, sequenced after-hours to avoid blocking customer traffic. Ground-up builds with trenching, new poles, and utility coordination run 2–4 weeks on site. Photometric design + pole + fixture lead time runs 2–5 weeks ahead of the install.

Code & permits

Parking-lot lighting falls under NEC 410 for fixtures and 225 for outside branch circuits and feeders. Dark-sky and light-trespass ordinances are a municipality-by-municipality conversation — Memorial Villages, for example, enforce stricter fixture cutoff than unincorporated Harris County. We check the AHJ ordinance before the fixture is specified, not after.

NEC 410NEC 225IES Photometric FilesDark-Sky Compliant OpticsHarris County AHJ

Frequently Asked Questions

How much does commercial parking lot lighting cost in Houston?+
An HID-to-LED retrofit on existing poles typically runs $350–$900 per fixture installed (bucket truck, drivers, labor, disposal). Full ground-up builds with new poles, concrete bases, and underground conduit run $3,500–$7,500 per pole assembly. Wall-pack and shoebox retrofits start at $250 per fixture. Trenching charges are per foot and site-dependent — rocky Cypress clay prices differently than loose Memorial fill.
How long does a parking lot re-lighting take?+
Most tenant-occupied lots are re-lit in 3–7 working days, sequenced after-hours to avoid blocking customer traffic. Ground-up builds with trenching, new poles, and utility coordination run 2–4 weeks on site. Photometric design + pole + fixture lead time runs 2–5 weeks ahead of the install.
Can you retrofit my existing HID poles to LED?+
Usually yes. Existing poles, bases, and conduit stay in place; the fixture head and driver are swapped, the ballast is removed, and the photocell is updated. Energy draw typically drops 55–70 percent, and the fixture warranty resets to the LED product spec.
Will my new LED fixtures be too bright or glare into neighbors?+
Not if the photometric is done right. We pick an optical distribution (Type III or IV for most lots) that pushes light into the lot and cuts it at the property line. Dark-sky cutoff fixtures are available when the municipality requires them.
Do photocells come standard or are they an add-on?+
Standard on every fixture we install. A commercial lot without a photocell is a lot that is either on at noon or off at 9 pm — neither is acceptable. For tenant-occupied lots we add a timer override for after-hours dimming.
How much will I save on power by going LED?+
Typical HID-to-LED retrofit reduces lighting power by 55–75 percent. A 15-pole lot running 400W HID at 12 hours/day saves roughly 18,000 kWh/year at the meter. At Texas commercial rates, that is real money back against the capital cost inside 2–3 years.
Can you add EV chargers to the same parking lot build?+
Yes — and it is cheaper to do it at the same time. The trench is already open, the service capacity is being checked, and we can drop EV make-ready conduit to future stall locations while the pavement is up.
Do you handle trenching for new underground lighting feeders?+
Yes. Directional bore or open-cut, depending on the pavement and the AHJ. We pull the permits, call 811, and patch the surface to the lot standard when the trench is backfilled.

Ready to get started?

Free site walk. Fixed-fee quote in 24 hours. Permits pulled and inspections passed on the first walk.